Manufacturing

Custom Retail Fixture Manufacturing for Global Projects
Metal Workshop
Millwork Workshop
Logo & Signage Workshop
Automatic Metal Painting Line
Millwork Painting Line
Dust Collection & Air Pollution Contorl
Raw Material Warehouse
Assembly Workshop
Finished Goods Warehouse

We manufacture made-to-order retail fixtures for brands, design firms, shopfitters, contractors, and store development teams. Our 10,000 m² facility in Guangzhou, China, has 120 employees and more than 20 woodworking and metalworking machines.

The manufacturing scope can coordinate joinery, metalwork, glass, mirror, acrylic, stone and solid surfaces, paint and specialty finishes, signage, lighting, hardware, and assembly. Projects can include a single store, flagship location, shop-in-shop, permanent indoor retail kiosk, production batch, or multi-store rollout.

Manufacturing begins after the required drawings, materials, finishes, quantities, samples, responsibilities, and commercial terms are approved. Website images and previous projects show manufacturing capabilities; they are not stocked or ready-to-ship products.

Manufacturing Checklist

Project fit

Confirm the project type, retail sector, store area, order value, number of locations, fixture quantities, destination, and required date.

Approved Manufacturing Information

Provide or approve the production drawings, dimensions, specifications, materials, finishes, hardware, lighting, graphics, and assembly requirements.

Fixture & Quantity Schedule

Confirm fixture types, item codes, quantities, store allocation, and any approved variations between locations.

Material & Component Scope

Identify the joinery, metal, glass, acrylic, stone, finishes, signage, lighting, hardware, and purchased components included in the order.

Samples & Standards

Record the approved material samples, finish samples, components, prototypes, tolerances, and other acceptance references.

Production Plan

Confirm approved quantities, production sequence, required approvals, batch releases, and the production lead-time starting point.

Quality Requirements

Define incoming, in-process, functional, assembly, and final inspection requirements against written project criteria.

Packaging & Labeling

Specify protection, component labels, store allocation, installation sequence, pallet or crate requirements, and shipping marks.

Delivery & Handover

Confirm the Incoterm, destination, freight scope, risk transfer, required documents, local contractor, and site responsibilities.

Repeat Production

Maintain the approved drawings, samples, finish standards, and change record required for later stores, replacement parts, or replenishment.

Send Your Drawings, Fixture List, and Quantities

Include the materials and finishes, destination, budget range, required date, and available approval samples. We will review the manufacturing fit and identify any information needed for quotation.
Drag & Drop Files, Choose Files to Upload You can upload up to 20 files.